Metrics are quantitative values that describe properties of tests or runs. They are used within the Insights Object to enable trend analysis and cross-run comparisons.
Metric Levels
Run-Level Metrics
Run-level metrics are calculated using all tests from all runs being analyzed. These provide a holistic view of test health across multiple runs.
Test-Level Metrics
Test-level metrics are calculated using all executions of a specific test case across runs. These help evaluate individual test stability and performance over time.
Metric Types
Percentage Metrics
Percentage metrics are represented as decimal values between 0 and 1:
| Value | Meaning |
|---|---|
0 | 0% |
0.25 | 25% |
0.5 | 50% |
1.0 | 100% |
Absolute Metrics
Absolute metrics are raw values with specific units (e.g., milliseconds for duration, counts for totals).
Standard Metrics
passRate
The proportion of tests with status passed.
- Type: Percentage metric
- Level: Run-level and test-level
- Calculation:
passed tests / total tests
failRate
The proportion of tests with status failed.
- Type: Percentage metric
- Level: Run-level and test-level
- Calculation:
failed tests / total tests
flakyRate
The proportion of tests identified as flaky.
A test is considered flaky only if its final status is passed and it experienced one or more failed attempts before succeeding. Tests that retry but never pass (final status failed) are not considered flaky.
- Type: Percentage metric
- Level: Run-level and test-level
- Calculation:
flaky tests / total tests
averageRunDuration
The mean duration of all test runs.
- Type: Absolute metric (milliseconds)
- Level: Run-level only
- Calculation:
sum of run durations / number of runs
averageTestDuration
The mean duration of all test executions.
- Type: Absolute metric (milliseconds)
- Level: Run-level and test-level
- Calculation (run-level):
sum of test durations / number of tests - Calculation (test-level):
sum of all attempt durations for this test / number of attempts across analyzed runs
p95RunDuration
The 95th percentile of test run durations. 95% of runs completed within this duration.
- Type: Absolute metric (milliseconds)
- Level: Run-level only
p95TestDuration
The 95th percentile of test execution durations. 95% of tests completed within this duration.
- Type: Absolute metric (milliseconds)
- Level: Test-level only
Related Documentation